Great Britain · Sat 28 Nov, 00:20–00:25 · Updated 00:30
Renewables are generating 43% of Great Britain’s electricity right now.
Low-carbon (renewables + nuclear) 60%Fossil fuels 29%Generating 28.4 GW
Right now · 00:20–00:25
Where it’s coming from, where it’s going
Power stations, wind farms and undersea cables feeding the grid on the left; on the right, what Great Britain is using, what it’s sending abroad. The width of each stream is its size.
Power flow
Storage
| Pumped hydro | +0.16 GW | generating |
| Batteries estimate | +0.01 GW | discharging |
Battery output isn’t published live, so this adds up the half-hour plans that battery sites submit to the grid. Real output differs when the grid asks them to respond to a change in frequency.
Wind
11.98 GW| Offshore | 8.22 GW | 69% |
| Onshore, transmission grid | 2.47 GW | 21% |
| Local networks (estimate) | 1.28 GW | 11% |
Right now · the map
Every big power station, and the cables to Europe
Each disc is a power station or wind farm, sized by what it plans to generate this half hour; the ring around it is how much it could. Offshore wind farms sit out in the North Sea. Interconnectors are bringing in a net 3.3 GW. Pick fuels to filter, point at or tap a station, or press play to watch the past day.
Generation map
27.0 GW from 147 stations
Plans for 00:30–01:00. Smaller sites on local networks, and most solar, aren’t on the map.
How much of each fleet is running
Drax
Biomass · capacity 2.64 GW
2.54 GW96% of 2.6 GW · now
Biggest right now · 147 generating
- 1Drax2.54
- 2Staythorpe1.73
- 3Torness1.29
- 4Hornsea Two1.22
- 5Sizewell1.20
- 6Hartlepool1.16
- 7Hornsea1.12
- 8Heysham1.05
- 9Pembroke0.87
- 10Keadby 20.84
- 11Peterhead0.82
- 12Didcot0.74
- 13Triton Knoll0.73
- 14Dogger Bank A0.63
- 15Dogger Bank B0.58
- 16East Anglia0.55
- 17London Array Windfarm0.53
- 18Race Bank Offshore Wind Farm0.49
- 19Walney Offshore Windfarm0.48
- 20Grain0.43
- 21West Burton0.43
- 22Enfield Energy0.42
- 23Cottam Development Centre Limited0.42
- 24Saltend South0.38
- 25Immingham CHP0.37
- 26Greater Gabbard Offshore Windfarm0.33
- 27Gwynt y Mor Offshore Wind Farm0.30
- 28Foyers G0.30
- 29Galloper Offshore Windfarm 10.29
- 30Sofia0.27
- 31Lynemouth0.26
- 32Sheringham Shoals Windfarm0.25
- 33Burbo Bank Offshore Windfarm0.24
- 34Lincs Offshore Wind Farm0.24
- 35Moray East0.23
- 36Seagreen Offshore Wind Farm0.22
- 37West of Duddon Sands0.21
- 38Humber Offshore Wind Farm0.21
- 39Dudgeon Offshore Wind Farm0.20
- 40Rampion Offshore Windfarm0.20
- 41Thanet Offshore Windfarm0.18
- 42Westermost Rough Windfarm0.18
- 43Fawley Cogen0.12
- 44Seagreen0.11
- 45Viking0.11
- 46Moray West0.10
- 47Neart na Gaoithe0.08
- 48Gunfleet Sands Windfarm0.07
- 49Stronelairg Windfarm0.07
- 50Fasnakyle G0.07
- 51Beatrice0.06
- 52Kilgallioch Wind Farm0.05
- 53Rothes Bio-Plant CHP0.05
- 54Ormonde Windfarm0.05
- 55South Kyle Wind Farm0.04
- 56Tilbury Green Power One0.04
- 57Whitelee Wind Farm0.04
- 58Garry Cascade0.03
- 59Pen y Cymoedd Wind Farm0.03
- 60North Kyle0.03
- 61Farr Wind Farm0.03
- 62Beinn An Tuirc 2 Windfarm0.03
- 63Clunie Cascade0.03
- 64Clyde Central Windfarm, Clyde North Windfarm, Clyde South Windfarm0.03
- 65Dunmglass Wind Farm0.02
- 66Gordonbush Wind Farm0.02
- 67Barrow Offshore Windfarm0.02
- 68Killin Cascade0.02
- 69Dersalloch Windfarm0.02
- 70Strathy North Wind Farm 10.02
- 71Conon Cascade0.02
- 72Kincardine0.02
- 73Moriston Cascade0.02
- 74Beauly Cascade0.02
- 75Edinbane Windfarm0.02
- 76Arecleoch Windfarm0.02
- 77Sandy Knowe Wind Farm0.01
- 78Corriegarth Wind Farm0.01
- 79Goole Fields 1 Windfarm0.01
- 80Baillie Wind Farm0.01
- 81Hywind 10.01
- 82Kilgallioch0.01
- 83Mark Hill Windfarm0.01
- 84Windy Rig0.01
- 85Halsary0.01
- 86Dorenell0.01
- 87Creag Riabhach Wind Farm0.01
- 88Kilbraur Windfarm0.01
- 89Berry Burn Windfarm0.01
- 90Moy Windfarm0.01
- 91Kennoxhead Wind Farm0.01
- 92Afton0.01
- 93Carraig Gheal Wind Farm0.01
- 94AChruach Wind Farm0.01
- 95Sanquhar Community Wind Farm Generation0.01
- 96Assel Valley Wind Farm0.01
- 97Black Law Wind Farm0.01
- 98Harestanes Windfarm0.01
- 99Airies Windfarm0.01
- 100Cour Wind Farm0.01
- 101Aikengall 2 Wind Farm Generation0.01
- 102Brockloch Rig 2 Windfarm0.01
- 103Glenchamber Wind Farm0.01
- 104Freasdail Wind Farm0.01
- 105Tralorg0.01
- 106Robin Rigg0.01
- 107Beinneun Wind Farm0.01
- 108Glen App Wind Farm0.01
- 109Bhlaraidh Windfarm 10.00
- 110Braes of Doune0.00
- 111Millennium Wind Farm0.00
- 112Blackcraig Windfarm0.00
- 113Galawhistle Wind Farm0.00
- 114Crossdykes0.00
- 115Clashindarroch Wind Farm0.00
- 116Minsca Wind Farm0.00
- 117Hill of Glaschyle Windfarm0.00
- 118Burn of Whilk Windfarm0.00
- 119An Suidhe Windfarm0.00
- 120Fallago Rig Wind Farm0.00
- 121Kype Muir0.00
- 122Hill of Towie Windfarm0.00
- 123Ewe Hill II Wind Farm0.00
- 124Beinn Tharsuinn0.00
- 125Hare Hill Extension Wind Farm0.00
- 126Bad a Cheo0.00
- 127Burwell battery0.00
- 128Lochluichart Windfarm0.00
- 129Harburnhead Wind Farm0.00
- 130Corriemoillie Wind Farm0.00
- 131Dalquhandy Wind Farm0.00
- 132Tullo0.00
- 133Auchrobert Wind Farm0.00
- 134Andershaw Wind Farm0.00
- 135Dalswinton Wind Farm0.00
- 136Whiteside Hill0.00
- 137Clachan Flats Windfarm0.00
- 138Aberdeen Bay0.00
- 139Douglas West Wind Farm0.00
- 140Coire Na Cloiche0.00
- 141Dun Law Extension Windfarm0.00
- 142Glens of Foudland0.00
- 143Minnygap Wind Farm0.00
- 144Gordonstown Windfarm0.00
- 145Pogbie0.00
- 146Keith Hill Windfarm0.00
- 147Craig 20.00
Drax: Biomass, generating 2.54 GW of 2.64 GW (96%). Staythorpe: Gas, generating 1.73 GW of 1.86 GW (93%). Torness: Nuclear, generating 1.29 GW of 1.35 GW (95%). Hornsea Two: Wind, generating 1.22 GW of 1.32 GW (92%). Sizewell: Nuclear, generating 1.20 GW of 1.29 GW (93%). Hartlepool: Nuclear, generating 1.16 GW of 1.24 GW (94%). Hornsea: Wind, generating 1.12 GW of 1.20 GW (93%). Heysham: Nuclear, generating 1.05 GW of 2.53 GW (41%). Pembroke: Gas, generating 0.87 GW of 2.38 GW (37%). Keadby 2: Gas, generating 0.84 GW of 0.89 GW (95%).
Over time
Choose how far back to look, and how finely to average it. Hover, tap or use the arrow keys on a chart to read exact values.
Averages over the past day
Generation by source
Price
Carbon intensity
Demand
Transfers
Batteries (estimate)
The past month
The grid’s fingerprint
Every square is one half hour: a row per day, midnight to midnight. Solar draws a bright band through the middle of sunny days, wind arrives in streaks that last for days, and the evening peak shows where gas fills the gap.
Carbon intensity, every half hour
The next 48 hours
The cleanest time to use electricity in the next day is Sat 28 Nov, 05:00–08:00, at about 65 g/kWh. Good for running a dishwasher, a washing machine or charging a car.
Carbon intensity forecast
Wind, solar and demand forecast
Agile Octopus prices
Agile Octopus charges a different price every half hour, following the wholesale market, and Agile Outgoing pays the same way for electricity you send back from solar panels or a battery. Tomorrow’s prices are published around 4pm.
London: import and export prices
Region by region
Carbon intensity across the 14 regional distribution networks. Scotland runs mostly on wind and hydro; the south leans more on gas and imports. Select a region to see what it’s running on.
Great Britain
128 g/kWh moderate
Generation mix now
| Wind | 41.3% | |
| Gas | 28.1% | |
| Nuclear | 15.9% | |
| Biomass | 8.1% | |
| Imports | 6.5% | |
| Hydro | 0.1% |
All regions, cleanest first
| Region | g/kWh |
|---|---|
| North Scotland | 0 |
| South Scotland | 0 |
| North East England | 1 |
| North West England | 29 |
| North Wales & Merseyside | 56 |
| Yorkshire | 81 |
| West Midlands | 109 |
| East Midlands | 134 |
| East England | 134 |
| London | 139 |
| South East England | 142 |
| South England | 171 |
| South Wales | 366 |
| South West England | 378 |
Grid frequency
Every generator on the grid spins in step at close to 50 cycles a second. When demand outstrips supply the frequency dips; when there’s too much power it rises. NESO keeps it within ±0.2 Hz of 50 Hz in normal operation, and batteries and power stations react within seconds to hold it there. Right now it’s 50.054 Hz.
The last hour
Since 2009
How Britain’s electricity changed
In 2009 coal and gas made most of Great Britain’s electricity. Coal is now gone, and wind is the largest single source in most months.
Loading the history…
Records
Half-hour records since 2009 (prices since 2016), recalculated from the full history every few minutes. A negative price means generators paid to keep running. Britain’s last coal-fired power station, Ratcliffe-on-Soar, closed on 30 September 2024, 142 years after the first opened at Holborn Viaduct in London.
Wind milestones
First half hour at each level, wind of every size| Wind output | First reached |
|---|---|
| 23 GW | 5 December 2025 |
| 22 GW | 5 December 2024 |
| 21 GW | 2 November 2022 |
| 20 GW | 25 May 2022 |
| 19 GW | 3 May 2021 |
| 18 GW | 10 December 2019 |
| 17 GW | 8 February 2019 |
| 16 GW | 28 November 2018 |
| 15 GW | 1 March 2018 |
| 14 GW | 17 January 2018 |
| 13 GW | 6 December 2017 |
| 12 GW | 2 October 2017 |
| 11 GW | 23 December 2016 |
| 10 GW | 23 December 2016 |
| 9 GW | 9 December 2014 |
| 8 GW | 18 October 2014 |
| 7 GW | 22 March 2013 |
| 6 GW | 19 November 2012 |
| 5 GW | 13 May 2012 |
| 4 GW | 12 November 2010 |
| 3 GW | 16 January 2010 |
| 2 GW | 11 January 2009 |
| 1 GW | 9 January 2009 |
| 0 GW | 1 January 2009 |
Notices from the grid
Recent messages from the system operator to the market, published on Elexon’s system warnings feed: margin notices when spare capacity runs low, and trades with neighbouring grids.
Electricity Margin NoticeFri 27 Nov, 13:49
From : Power System Manager – NESO Electricity Control Centre NOTIFICATION CANCELLATION of GB TRANSMISSION SYSTEM WARNING The GB Transmission System Warning ELECTRICITY MARGIN NOTICE issued for the period from 14:00 hrs to 20:00 hrs on Friday 27/11/2026 has been cancelled The following GB Transmission System Warnings remain in force NONE Notification Issued at 13:50 hrs on 27/11/2026 Issued by Power System Manager NESO Electricity Control Centre
So-So TradesFri 27 Nov, 13:44
NATIONAL ENERGY SYSTEM OPERATOR NOTIFICATION of excess energy prices used for settlement outside of BALIT for SO to SO Transactions over the National Grid/RTE Interconnector. Prices cover 23:00Hrs Today to 05:00Hrs Tomorrow (UK local time) and are in Euro/MWh. From RTE: Offer 350.00; Bid 0.00 From NESO: Offer 701.21; Bid -210.36 Prices cover 05:00Hrs Tomorrow to 19:00Hrs Tomorrow (UK local time) and are in Euro/MWh. From RTE: Offer 350.00; Bid 0.00 From NESO: Offer 1168.68; Bid -210.36 Prices cover 19:00Hrs Tomorrow to 23:00Hrs Tomorrow (UK local time) and are in Euro/MWh. From RTE: Offer 350.00; Bid 0.00 From NESO: Offer 1168.68; Bid -210.36
Electricity Margin NoticeFri 27 Nov, 10:12
From : Power System Manager – NESO Electricity Control Centre
ELECTRICITY MARGIN NOTICE
An ELECTRICITY MARGIN NOTICE has been issued by the National Energy System Operator to encourage market actions to increase System Margins.
For the period:
from 14:00 hrs to 20:00 hrs on Friday 27/11/2026
There is a reduced system margin. System margin shortfall 1780 MW
The current contingency requirement is 427 MW.
3200 MW of generation is excluded from the available system margin due to system constraints.
Maximum Generation Service may be instructed.
Trading Points, Control Points and Externally interconnected System Operators are requested to notify National Energy System Operator of any additional MW capacity.
Suppliers please advise National Energy System Operator of any additional Demand Control available.
The situation will be reviewed again by National Energy System Operator at 14:00 hours and an update issued.
This Notification of Issue of a GB Transmission System Warning - ELECTRICITY MARGIN NOTICE Issued at 10:10 hrs on 27/11/2026
Issued by Power System Manager NESO Electricity Control Centre
**************
Information Note:-
As the System Operator, NElectricity Margin NoticeFri 27 Nov, 09:43
From : Power System Manager – NESO Electricity Control Centre NOTIFICATION CANCELLATION of GB TRANSMISSION SYSTEM WARNING The GB Transmission System Warning ELECTRICITY MARGIN NOTICE issued for the period from 07:00 hrs to 10:00 hrs on Friday 27/11/2026 has been cancelled The following GB Transmission System Warnings remain in force The EMN for 14:00-20:0 is still in force . . Notification Issued at 09:38 hrs on 27/11/2026 Issued by Power System Manager NESO Electricity Control Centre
Electricity Margin NoticeFri 27 Nov, 01:32
From : Power System Manager – NESO Electricity Control Centre
ELECTRICITY MARGIN NOTICE
An ELECTRICITY MARGIN NOTICE has been issued by the National Energy System Operator to encourage market actions to increase System Margins.
For the period:
from 14:00 hrs to 20:00 hrs on Friday 27/11/2026
There is a reduced system margin. System margin shortfall 2400 MW
The current contingency requirement is 979 MW.
2700 MW of generation is excluded from the available system margin due to system constraints.
Maximum Generation Service may be instructed.
Trading Points, Control Points and Externally interconnected System Operators are requested to notify National Energy System Operator of any additional MW capacity.
Suppliers please advise National Energy System Operator of any additional Demand Control available.
The situation will be reviewed again by National Energy System Operator at 10:00 hours and an update issued.
This Notification of Issue of a GB Transmission System Warning - ELECTRICITY MARGIN NOTICE Issued at 01:20 hrs on 27/11/2026
Issued by Power System Manager NESO Electricity Control Centre
**************
Information Note:-
As the System Operator, NElectricity Margin NoticeFri 27 Nov, 01:23
From : Power System Manager – NESO Electricity Control Centre
ELECTRICITY MARGIN NOTICE
An ELECTRICITY MARGIN NOTICE has been issued by the National Energy System Operator to encourage market actions to increase System Margins.
For the period:
from 07:00 hrs to 10:00 hrs on Friday 27/11/2026
There is a reduced system margin. System margin shortfall 2500 MW
The current contingency requirement is 558 MW.
4500 MW of generation is excluded from the available system margin due to system constraints.
Maximum Generation Service may be instructed.
Trading Points, Control Points and Externally interconnected System Operators are requested to notify National Energy System Operator of any additional MW capacity.
Suppliers please advise National Energy System Operator of any additional Demand Control available.
The situation will be reviewed again by National Energy System Operator at 10:00 hours and an update issued.
This Notification of Issue of a GB Transmission System Warning - ELECTRICITY MARGIN NOTICE Issued at 01:15 hrs on 27/11/2026
Issued by Power System Manager NESO Electricity Control Centre
**************
Information Note:-
As the System Operator, NElectricity Margin NoticeThu 26 Nov, 16:58
From : Power System Manager – NESO Electricity Control Centre NOTIFICATION CANCELLATION of GB TRANSMISSION SYSTEM WARNING The GB Transmission System Warning ELECTRICITY MARGIN NOTICE issued for the period from 16:00 hrs to 20:00 hrs on Thursday 26/11/2026 has been cancelled The following GB Transmission System Warnings remain in force None - - Notification Issued at 17:00 hrs on 26/11/2026 Issued by Power System Manager NESO Electricity Control Centre
Electricity Margin NoticeThu 26 Nov, 14:04
From : Power System Manager – NESO Electricity Control Centre
ELECTRICITY MARGIN NOTICE
An ELECTRICITY MARGIN NOTICE has been issued by the National Energy System Operator to encourage market actions to increase System Margins.
For the period:
from 16:00 hrs to 20:00 hrs on Thursday 26/11/2026
There is a reduced system margin. System margin shortfall 900 MW
The current contingency requirement is 0 MW.
5500 MW of generation is excluded from the available system margin due to system constraints.
Maximum Generation Service may be instructed.
Trading Points, Control Points and Externally interconnected System Operators are requested to notify National Energy System Operator of any additional MW capacity.
Suppliers please advise National Energy System Operator of any additional Demand Control available.
The situation will be reviewed again by National Energy System Operator at 20:00 hours and an update issued.
This Notification of Issue of a GB Transmission System Warning - ELECTRICITY MARGIN NOTICE Issued at 14:05 hrs on 26/11/2026
Issued by PSM NESO Electricity Control Centre
**************
Information Note:-
As the System Operator, National Energy SysAbout the data
Grid Live shows how Great Britain’s electricity is being made, moved and priced, updated every five minutes. It is an independent project, inspired by Kate Morley’s National Grid: Live, whose code is in the public domain.
Where the numbers come from
Elexon Insights Solution: generation by fuel type, interconnector flows, pumped storage, wholesale and imbalance prices, grid frequency, battery sites’ physical notifications, wind and demand forecasts. Contains BMRS data © Elexon Limited copyright and database right 2026.
National Energy System Operator (NESO) Data Portal: estimates of wind and solar on local distribution networks, historic demand and generation back to 2009, and embedded wind and solar forecasts. Supported by NESO’s Open Data Licence.
Carbon Intensity API (NESO and the University of Oxford Department of Computer Science): national and regional carbon intensity and its forecast, under CC BY 4.0.
Power Station Dictionary (Open Source UK Energy Data): where each power station is and which grid units belong to it, under CC BY 4.0, with stations built since 2024 placed by hand from public sources.
What the terms mean
- Generation
- Everything generated in Great Britain: coal, gas, nuclear, wind, solar, hydro, biomass and other sources such as waste.
- Transfers
- Net flow through the interconnectors plus pumped storage. Positive means power coming into the grid.
- Demand
- Generation plus transfers: the electricity Great Britain is using.
- Carbon intensity
- Grams of CO₂ emitted for each kilowatt-hour generated, including imports.
- Settlement period
- Electricity is bought and sold in half hours, numbered from 1 at midnight (46 or 50 on the days the clocks change).
Things to know
Wind and solar on local networks aren’t metered live, so they are NESO estimates; the latest half hours use NESO’s forecast until its estimate arrives about a day later. Battery output, and each station’s output on the map, are estimates from the plans sites submit for each half hour; the grid then adjusts them in real time. The map shows sites connected to the transmission grid, so most solar and small wind farms aren’t on it. Before 2016 the generation mix comes from NESO’s historic dataset, which doesn’t split gas by plant type. Prices start in September 2016, and carbon intensity before September 2017 uses NESO’s historic series, which is calculated slightly differently.